![]() ![]() Get Action Messages: This function serves as a short-term planning tool by issuing action messages to alert the user of any modifications made since the last regenerative or net change plan was calculated.Planning parameter changes: These include changes in safety stock, reorder point, routing, bill of material, and changes to the time bucket or lead time calculation.An unplanned inventory level change is also considered a quantity change. Demand/supply changes: These include modifications to quantities on sales orders, demand forecasts, assembly orders, production orders, or purchase orders.Items are considered in net change planning from two types of changes: Calculate Net Change Plan: This function processes a net change plan.This process starts by deleting all planned supply orders that are currently loaded. Calculate Regenerative Plan: This function processes or regenerates the material plan.Proper planning results depend on the set up done on item cards, assembly BOMs, production BOMs, and routings. For more information, see Track Relations Between Demand and Supply. Links created by the planning engine between demand and its related supply can be tracked on the Order Tracking page. The term "order" includes purchase orders, assembly orders, production orders, and transfer orders. Action messages are suggestions to create a new order, change an order (quantity or date), or cancel an order already on order. When these quantities are netted against each other, Business Central provides action messages. The planning system process examines what is needed or will be needed (demand) and what is on-hand or expected (supply). The planning algorithms pertain to netting, reuse of existing replenishment orders, and action messages. The planning algorithms used for both MPS and MRP are identical. The purpose of MRP is to provide time-phased formal plans, by item, to supply the appropriate item, at the appropriate time, in the appropriate location, in the appropriate quantity. MRP is calculated only for items that are not MPS items. MRP is the calculation of material requirements based on actual demand for components and the demand forecast on the component level.These items are called MPS items and are identified dynamically when the calculation starts. The MPS calculation is used for end items that have a forecast or a sales order line. MPS is the calculation of a master production schedule based on actual demand and the demand forecast.The planning system can calculate either Master Production Schedule (MPS) or Material Requirements Planning (MRP) on request, or it can calculate both at the same time. No.The terms "running the planning worksheet" or "running MRP" refer to the calculation of the master production schedule and material requirements based on actual and forecasted demand.End to End Response Time (in seconds): 10.The above-given calculator will provide him TPS value as well as TPH value: This value will help him to analyse the server capacity to handle the page requests at 50 user load. Now, he wants to calculate the total number of transactions per second. 40 seconds include both end-to-end response time and think time which are 10 seconds and 30 seconds respectively. The script takes 40 seconds to complete one iteration. He prepares the script contains Home Page, Login and Logout page transactions. Workload Modelling: A performance tester needs to design the workload model for the above requirement. There are only 3 pages which need performance check. ![]() The transaction flow is Home Page -> Login -> Logout. Requirement: A company want to test very basic functionality of its website.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |